PMT EVO 2.0 South at
CLIP Logistics in Poland

PMT EVO 2.0 S 15°

Largest PV system implemented with the PMT EVO 2.0 S

The most powerful PV system in Poland to date went on line in late 2019. With an impressive 22,947 solar panels and a total output of nearly 7 MWp, the project was a true challenge of planning, technology, logistics and installation.

Project report

With our partner of many years, GOLDBECK SOLAR, our certified installation partner SOL IN ONE Dresden and, of course, our revolutionary flat roof mounting system PMT EVO 2.0 S 15°, we were able to successfully overcome this challenge.

Keyfacts

PMT EVO 2.0

System

6.698 kWp

Power

3000 QM

System surface

22947

Implemented panels

Flat roof

Roof type

Jasin, PL

Site

Result

The project at the company location in Jasin encompassed five halls of the Polish logistics group CLIP Logistics Magazyn. Special challenges were posed by the limited load reserves of the roofs, which were solved by using aerodynamically optimised side solar panels on the system and load-transmitting ridge couplings.
The project at the company location in Jasin encompassed five halls of the Polish logistics group CLIP Logistics Magazyn. Special challenges were posed by the limited load reserves of the roofs, which were solved by using aerodynamically optimised side solar panels on the system and load-transmitting ridge couplings.
YOUR CONTACT PERSON
Nadine Teller
Key Account Manager
+ 49 (0) 9225 95500 project@pmt.solutions contact now
Partner
Back to top