The best free-standing mounting system in the world*
Premium Mounting - Finally also for open spaces!
Maximum space flexibility - for small and large projects.
With PMT TITAN, unused areas become high-performance PV systems. Thanks to standardized components and innovative installation from below, you save time and money - and realize your project in record time.
Experience the proven quality of a pioneer in the field of renewable energies and technology leadership.
* from PMT
Discover your advantages
Simple? Simple!
Extra flexible
Safe is safe
Fast - brought to the surface
Sustainable, European, good.
Experience real open space culture
Perfectly planned, simply installed
PMT TITAN - The best we have ever produced in series
Efficiently installed, used twice
The system ensures that the legally prescribed minimum heights of 800 to 1000 mm (depending on the federal state) can be achieved - for an optimum combination of efficient energy generation and additional agricultural use.
The system ensures that the legally prescribed minimum heights of 800 to 1000 mm (depending on the federal state) can be achieved - for an optimum combination of efficient energy generation and additional agricultural use.
Vertical mounting and horizontal mounting
3–4 modules stacked on top of each other
from 3 modules side by side
Endless assembly possible
All common PV module sizes:
Length: 1700 – 2500 mm
Width: 1000–1350 mm
Height: 25–35 mm
Quarter-point clamping and 6-point clamping possible
Maximum pile length: 4000 mm
80–120 cm (grazing height for sheep)
Can also be used in coastal areas*
Free dimensioning via number of pile posts and purlins
Individual system statics based on local conditions
Niederohmiger Verbindungsnachweis (<1 Ω) DIN VDE 0100-540, DIN VDE 0100-712
PMT BEYOND
ARE YOU PLANNING A PROJECT?
WE WILL BE HAPPY TO ADVISE YOU
FAQ
Frequently asked questions
Which tools are required or recommended for installation?
- Ring wrench or ratchet with socket, SW 13, 17, 18, 19
- Impact wrench
- Torque wrench min. 20 Nm - 120 Nm
- Impact cord
- Mason's cord
- Spirit level with degree indicator
Does PMT provide installation training?
What sizes (kWp) can we offer? From - to PV power?
What variants can I build with the system?
What is the maximum length of a table?
The maximum module field size / table up to the separation is then, after 28.4 m.