PMT EVO 2.0 S 10°

Largest PV system realized with PMT EVO 2.0 S

The most powerful PV system in Poland to date was connected to the grid in August 2019. With an impressive 22,947 modules and a total output of almost 7 MWp, the project was a real challenge in terms of planning, technology, logistics and installation.

Project Report

Together with our long-standing partner GOLDBECK SOLAR, our certified installation partner SOL IN ONE Dresden and, of course, our revolutionary PMT EVO 2.0 S 10° flat roof installation system, we were able to successfully master this challenge.

Key Facts

PMT EVO 2.0

System

6,698 kWp

Achievement

3000 QM

System Area

22947

Built-in modules

Flat roof

Roof type

Jasin, PL

Location

Result

The project at the company site in Jasin comprised five halls for the Polish logistics group CLIP Logistics Magazyn. Special challenges arose due to the limited load reserves of the roofs, which could be solved by using aerodynamic-optimizing side plates on the system and load-transferring ridge couplings.
The project at the company site in Jasin comprised five halls for the Polish logistics group CLIP Logistics Magazyn. Special challenges arose due to the limited load reserves of the roofs, which could be solved by using aerodynamic-optimizing side plates on the system and load-transferring ridge couplings.